Ko Savonije

Bath Iron Works lands $32.5 million contract modification for second stealth destroyer


The U.S. Navy has awarded Bath Iron Works a $32.5 million contract modification to perform technical and industrial engineering work on the future USS Michael Monsoor, the second Zumwalt-class destroyer, at its Bath shipyard.

The modification follows a $24.4 million modification awarded in April for additional detail design and construction of the Navy’s newest class of destroyers.

Bath Iron Works is building three DDG 1000s for the U.S. Navy, which truncated the line after deeming construction costs to be too high. The USS Zumwalt, named for Adm. Elmo R. “Bud” Zumwalt Jr., was christened in April.

Read more
  • Love
  • Save
    Add a blog to Bloglovin’
    Enter the full blog address (e.g. https://www.fashionsquad.com)
    We're working on your request. This will take just a minute...