La Maglia di Marica

lamagliadimarica.com · Jan 17, 2021

Poncho pull

DIAMOND TEXTURE KNIT PONCHO

Taglie

Per una circonferenza del busto di:

XS/M 71-96.5 cm

L/XL 101.5-117 cm

2/5XL 122-157.5 cm

Campione

18 m e 24 ferri = 10 cm a m rasata

Abbreviazioni

Kfb = aum 1 m lavorando davanti e dietro la m succ

PM = piazzare un marker

RS = Dir del lav

WS= Rov del lav

Ssk = due ass al dir ritorto

Punto diamante si lav su un multiplo di 4 m

Quadratino bianco: dir sul dir e rov sul rov

Quadratino con lineetta: rov sul dir e dir sul rov

Spiegazione scritta del punto:

F 1: (RS). (1 dir,1 rov) due volte.

Ferro due e tutti i ferri pari : lav le m come si presentano

F 3: 1 rov,3 dir

F 5 come il f 1.

F 7:2 dir,1 rov,1 dir

F 8 come il f 2

Rip questi 8 ferri per il p diamante

MATERIALE

Red Heart® Heat WaveTM (3.5 oz /100 g; 198 yds/181 m)

Sizes XS/M L/XL 2/5XL

Radio (0420) 6 8 10 gomitoli

Ferri:

5mm dir e circolari da 40 cm e 80 cm

Cavi o filato di scarto per m in attesa

SPIEGAZIONE .

Dietro e davanti sono uguali

F1(dir del lav):montare 42 (50-58) m e lav 1 dir, poi il primo ferro del p diamante per : 10 (12-14) volte e finire con 1 dir .

f 2 :1 rov , lav il secondo ferro del p diamante e finire con 1 rov.

Proseguendo in questo modo aumentare una maglia ai lati del ferro nei successivi 16 ferri incorporando le maglie aumentate nel punto diamante : 74 (82-90) m.

Aumentare 1 m ai lati del ferro al F succ e ogni due ferri per altre 15 volte sempre lav a p diamante le m aumentate e finendo con un f sul dir del lav : 106 (114-122) m.

Lav un altro ferro

Aum 1 m ai lati del ferro succ e poi ogni 4 ferri un’altra volta e finendo al dir del lav . 110 (118-126) m

Lav altri 5 ferri

Mettere un marker ai lati dell’ultimo ferro.

Diminuzioni per i raglans: sempre lavorando il punto diamante proseguire in questo modo:

f 1 : (dir del lav ):2 dir,ssk, punto diam fino alle ultime 4m:2 ass al dir,2 dir .

f 2:3 rov, lav fino alle ultime 3m:3 rov

F3: 3 dir, lav fino alle ultime 3m:3 dir

F 4 come il f 2.

Rip gli ultimi 4 ferri un’altra volta . 106 (114-122) m

Proseguire in questo modo :

f 1 (dir del lav): 2 dir,ssk, p diam fino alle ultime 4m:2 ass,2 dir.

F 2: 3 rov, p diamante fino alle ultime 3m:3 rov

Rip gli ultimi 2 ferri altre37 volte fino a che resteranno 30 (38-46) m.

Lav altri 2 ferri

Chiudere le 30 (38-46) m.

Bordo a coste al fondo

Al diritto del lavoro e con i ferri circolari più lunghi riprendere e lavorare al dritto 155 maglie (163,171) lungo il bordo in basso tra i markers.lavorando in avanti indietro procedere in questo modo:

Ferro uno: (rovescio del lavoro):1 rov, *, 1 dir,1 rov*ripetere fino alla fine del ferro

F 2: 1 dir. *1 rov,1 dir* rip fino alla fine del ferro .

Rip gli ultimi due ferri a coste 1/1 altre 4 volte poi rip il primo ferro

Chiudere lavorando a coste .

Maniche

Montare 40 (40-46) m.

f 1:(dir del lav):1 dir(1 rov,1 dir) rip fino alla fine del ferro .

f2:1 rov . *1 dir,1 rov * rip.

Rip gli ultimi 2 ferri di coste 23 volte , poi rip il f 1 finendo con un f sul dir del lav

PM ai lati dell’ultimo ferro .

F succ : (rov del lav ). *1 rov, lav . (1 rov,1 dir) nella m succ .* rip fino alle ultime 0 (0-2) m. 0 (0-2) rov . 60 (60-68) m.

Proseguire in questo modo :

F 1: (dir del lav ). Kfb. 1 dir. Lavorare il primo ferro del p . Diamante ripetendo le 4 m del motivo fino alle ultime 2 m : Kfb. 1 dir . 62 (62-70) m.

f 2 : due rovesci, lavorare il secondo ferro del motivo fino alle ultime due maglie, due rovesci.

Ripetere questi ultimi due ferri aumentando una maglia ai lati del F succ e poi ogni due ferri per altre 11 volte fino ad avere 86 (86-94) m , finendo con un f sul dir del lav.

Lav altri 11 ferri .

Raglans: Chiudere 5 m all’inizio dei succ 2 ferri:. 76 (76-84) m.

Lav altri 2 ferri .

Proseguire in questo modo :

F 1: (dir del lav). 2 dir. ssk. Lav fino alle ultime 4 m:2 ass al dir,2 dir.

F 2: 3 rov . Lav fino alle ultime 3 m:3 rov

F 3:3 dir, lav fino alle ultime 3 m:3 dir

F 4 come il f 2

Rip gli ultimi 4 ferri altre 11 volte:52 (52-60).

Proseguire in questo modo :

F 1: (dir del lav ). 2 dir . ssk. Lav fino alle ultime 4 m:2 ass al dir,2 dir.

F 2 : 3 rov, lav fino alle ultime 3m:3 rov

Rip gli ultimi 2 ferri altre 16 volte

Chiudere le 18 (18-26) m rimaste..

FINITURE

Stendere le diverse parti su un tappetino portandole alle misure indicate e fissarle con degli spilli

Coprire con un panno leggermente umido e lasciare asciugare

Cucire le maniche

Sovrapporre i lati del bordo a coste finale al sottomanica e cucirli assieme . Cucire i raglan e i sottomanica .

Collo

Al dir del lav e con i ferri circ più corti iniziando al centro della manica sinistra riprendere e lav al dir 9 (9-13) m dalla manica sinistra, 30 (38-46) m dal davanti , 18 (18-26) m dalla manica destra ( in attesa ), 30 (38-46) m dal dietro ( in attesa), 9 (9-13) m dalla. 96 (112-144) m in totale . Proseguire in tondo e PM sulla prima m per indicare l’inizio del giro.

g1: : (1 dir,1 rov) 4 (4-6) volte. 2 ass al dir (raglan). (1 rov,1 dir ) 14 (18- 22) volte . 2 ass al rov (raglan). (1 dir,1 rov) 8 (8-13) volte . 2 ass al dir (raglan). (1 rov,1 dir) 14 (18-22) volte . 2 ass al rov(raglan). (1 dir,1rov) 4 (4-6) volte . 92 (108-140) m rimaste.

g 2:*1 dir,1 rov* per tutto il giro .

Rip l’ultimo giro fino a che il collo misurerà 21 cm

Chiudere lavorando a coste

https://www.yarnspirations.com/on/demandware.static/-/Sites-master-catalog-spinrite/default/dw18da450f/PDF/RHK0107-027575M.pdf

n 2

SHOP KIT

GREAT CURVES KNIT PONCHO

MEDIUM

Alt = Alternate(ing) Beg = Beginning Cont = Continue(ity) Inc = Increase

K = Knit

K2tog = Knit next 2 stitches together

P = Purl

Pat = Pattern

PM = Place marker

Rem = Remaining

SIZES

To fit bust measurement

XS/S 28-38″ (71-96.5 cm) L/XL 40-46″ (101.5-117 cm) 2/5XL 48-62″ (122-157.5 cm)

GAUGE

19 sts and 25 rows = 4″ (10 cm) in stocking st

INSTRUCTIONS

The instructions are written for smallest size. If changes are necessary for larger sizes the instructions will be written thus ( ).

4

MATERIALS

Caron® Simply SoftTM (5 oz/141 g; 250 yds/228 m)

Sizes XS/S L/XL

Gray Heather Tweeds (23002) 6 7 9 balls

Rep = Repeat

Rnd(s) = Round(s)

RS = Right side

Ssk = Slip next 2 stitches knitwise one at a time. Pass them back onto left-hand needle, then knit through back loops together St(s) = Stitch(es)

Tog = Together

WS = Wrong side

Numbers for each size are shown in the same color throughout the pattern. When only one number is given in black, it applies to all sizes.

Diamond Panel Pat (worked over 4 sts). (See Chart on page 3). 1st row: (RS). (K1. P1) twice.

2nd and alt rows: Knit all knit sts, purl all purl sts as they appear. 3rd row: P1. K3.

5th row: As 1st row.

7th row: K2. P1. K1.

8th row: As 2nd row.

These 8 rows form Diamond Panel Pat.

KNIT I SKILL LEVEL: INTERMEDIATE ABBREVIATIONS

2/5XL

Size U.S. 7 (4.5 mm) knitting needles. U.S. 7 (4.5 mm) circular knitting needles 16″ (40.5 cm) and 29″ (74 cm) long or size needed to obtain gauge. 4 st holders. Stitch markers.

CAK0107-002456M | September 25, 2019 GREAT CURVES KNIT PONCHO 1 of 3

GREAT CURVES KNIT PONCHO

Back and Front (make alike) With pair of needles, cast on 29 (37-45) sts.

1st row: (RS). Work 1st row of Diamond Panel Pat to last st, noting 4-st rep will be worked 7 (9-11) times. K1.

2nd row: P1. Work 2nd row of Diamond Panel Pat to end of row. Diamond Panel Pat is now in position.

Shape sides: Keeping cont of pat, cast on 4 sts at beg of next 10 rows to 69 (77-85) sts, then inc 1 st each end of needle on next 14 rows, taking inc sts into pat. 97 (105-113) sts.

Inc 1 st each end of needle on next and every following alt row 8 times more, taking inc sts into pat, ending on a RS row. 115 (123-131) sts.

Work 3 rows even.

Inc 1 st each end of next and every following 4th row twice more, taking inc sts into pat and ending on a RS row. 121 (129-137) sts. Work 3 rows even. PM at each end of last row.

Shape raglans: Keeping cont of pat, proceed as follows:

1st row: (RS). K2. ssk. Pat to last 4 sts. K2tog. K2.

2nd row: P3. Pat to last 3 sts. P3. 3rd rows: K3. Pat to last 3 sts. K3. 4th row: As 2nd row.

Rep last 4 rows 14 times more. 91 (99-107) sts.

Proceed as follows:

1st row: (RS). K2. ssk. Pat to last 4 sts. K2tog. K2.

2nd row: P3. Pat to last 3 sts. P3. Rep last 2 rows 25 times more. Leave rem 39 (47-55) sts on a st holder.

Lower Ribbing: With RS facing and longer circular needle, pick up and knit 155 (163-171) sts along lower edge between markers. Do not join. Working back and forth across needle in rows, proceed as follows:

1st row: (WS). P1. *K1. P1. Rep from * to end of row.

2nd row: K1. *P1. K1. Rep from * to end of row.

Rep last 2 rows of (K1. P1) ribbing 4 times more, then 1st row once. Cast off in ribbing.

Sleeves

With pair of needles, cast on 41 (41-47) sts.

1st row: (RS). K1. *P1. K1. Rep from * to end of row.

2nd row: P1. *K1. P1. Rep from * to end of row.

Rep last 2 rows of (K1. P1) ribbing until work from beg measures 4″ (10 cm), ending on a RS row. PM at each end of last row.

Next row: (WS). *P1. (P1. K1) in next st. Rep from * to last 1 (1-3) st(s). P1 (1-3) sts. 61 (61-69) sts.

Proceed as follows:

1st row: (RS). Work 1st row of Diamond Panel Pat to last st, noting 4-st rep will be worked 15 (15-17) times. K1.

2nd row: P1. Work 2nd row of Diamond Panel Pat to end of row. Diamond Panel Pat is now in position.

Keeping cont of pat, inc 1 st each end of needle on next and every following alt row 10 times more to 83 (83-91) sts, then every following 4th row 3 times more, taking inc sts into pat and ending on a RS row. 89 (89-97) sts.

Work 3 rows even.

Shape raglans: Keeping cont of pat, cast off 5 sts beg next 2 rows. 79 (79-87) sts.

1st row: (RS). K2. ssk. Pat to last 4 sts. K2tog. K2.

2nd row: P3. Pat to last 3 sts. P3. 3rd rows: K3. Pat to last 3 sts. K3. 4th row: As 2nd row.

Rep last 4 rows 25 times more. 27 (27-35) sts.

Proceed as follows:

1st row: (RS). K2. ssk. Pat to last 4 sts. K2tog. K2.

2nd row: P3. Pat to last 3 sts. P3. Rep last 2 rows 3 times more. Leave rem 19 (19-27) sts on a st holder.

FINISHING

Pin all pieces to measurements. Cover with a damp cloth leaving cloth to dry.

Sew Sleeve seams. Overlap Lower Ribbing at underarm and sew sides tog. Sew raglan and underarm seams.

CAK0107-002456M | September 25, 2019 GREAT CURVES KNIT PONCHO 2 of 3

GREAT CURVES KNIT PONCHO

Neckband: With RS facing and shorter circular needle, beg at back left raglan seam, K19 (19- 27) from Left Sleeve st holder. K39 (47-55) sts from Front st holder. K19 (19-27) from Right Sleeve st holder. K39 (47-55) sts from Back st holder. 116 (132- 164) sts. Join in rnd. PM on first st. 1st rnd: *K1. P1. Rep from * around.

Rep last rnd 4 times more. Cast off in ribbing.

8 – 91⁄2 – 11

Front and Back 18 9

25 – 27 – 29

4 – 4 – 51⁄2

Sleeve 18

Chart

7 5 3 1

4-st rep

Key

= Knit on RS rows. Purl on WS rows. = Purl on RS rows. Knit on WS rows.

27

28

181⁄2 – 181⁄2 – 201⁄2

13 – 13 – 141⁄2

6 4

CAK0107-002456M | September 25, 2019 GREAT CURVES KNIT PONCHO 3 of 3

View original
  • Love
  • Save
    1 love 1 save
    Forgot Password?
    Add a blog to Bloglovin’
    Enter the full blog address (e.g. https://www.fashionsquad.com)
    We're working on your request. This will take just a minute...