Astrid Hagen Mykletun

our house renovation, week 10









The driveway (I finally found what I believe is the right term for this area) is very, very close to done. Very happy with how the new, square paving stones work together with the old paving stones. In fact it looks much better than expected.


The previous owner of our house moved into a small apartment, so she didn't have room for her collection of pelargonium pots. Love seeing them still in bloom, even in early November.

6 pm house inspection



yet another Saturday date at the lumber yard


laminate flooring for the basement suite - underfloor heating too



solid hardwood flooring for the ground floor





Second coat of paint in the basement suite is done! Color: Refleksjon by Jotun

Siding material for the walls where we change windows. The whole house needs new paint, but not until next year. Might go for something completely different than white - dark grey, maybe. Also, pretty much of the construction waste is gone - for now.

sun on the storage area

  • Love
  • Save
    Add a blog to Bloglovin’
    Enter the full blog address (e.g. https://www.fashionsquad.com)
    We're working on your request. This will take just a minute...